build a deck on sloped ground

A raised deck is a great way to make the most of space that can otherwise go unused such as slopes and uneven areas, creating a level space for entertaining, eating al fresco, or just sitting out and enjoying the sunshine. Before you start, head to our guide to planning your decking project for an essential introduction.

For that reason, we decided that building a post and beam foundation would be the best way to go. This article is a step-by-step guide for how we built it, and if you've read our article for building a deck, you'll see some similarities. Editors update: The shed has been delivered, and I've updated this post with

Sturdy deck built on steeply sloping hillside with wood and metal railing perfect for my backyard, adding a kids play area with a slide. .. As the hill drops the far edge of the deck sits 6 meters above ground. The deck is cut to . How to Build Your Own Elevated Deck on Uneven Ground - DIY - Small Budget, Minimal Cuts.

Sloping ground presents a number of challenges when attempting to build a deck. Since the ground is not flat, building a level deck requires accounting for the severity of the grade the land slopes to make sure your construction is stable. In fact, building a deck on sloped land creates living and recreational space because

Building a deck on a sloped surface is more difficult than building on level ground, but all the more worth it. Such an addition adds value to a home by providing more level, usable space.

How to build a deck. Part 5, by www.qualitydecking.co.uk -- Building a sub-frame for decking. Part 5 shows how to build a raised deck sub-frame using

This article will show you how to build a sturdy deck using common tools with minimal cuts and expense. Follow along for instructions, material lists and time and money saving tips and tricks.

www.homebuildingandrepairs.com decks index.html Click on this link for a complete organized list of deck construction and design videos. As soil builds up around surrounding concrete footings, wood posts can become buried under the ground and eventually start to decompose themselves.

You can do this by building up the low area, reducing the high area, or a combination of the two, which minimizes materials needed or needing to be For example, if the yard has a slope down going away from the deck, more distance covered by treads will require more total rise, so you might add an

Spacers let you run sleepers parallel to the house so decking can run perpendicular to the house (if that's what you prefer). A patio typically slopes away from the house so that water runs off. If you run sleepers parallel to the house and set them directly on the concrete, each sleeper will block runoff. But with spacers, water

We're used to looking at a patio or deck after it's built, so we assume the setting is natural. In fact patios require level ground so if you have any type of slope, there will be added cost to level out the ground. That's not all as more than a few inches might also require some type of retaining wall to maintain the level ground or

A sloped yard will require grading or installing posts, which is more time-consuming and can involve a bit more engineering. A raised deck must have the proper structural support beneath it as well as the railings around it, which can double the price of an on-grade deck (which is just one step above the ground).

You can build decks sized 10 feet by 20 feet, 12 feet by 16 feet, or 14 feet square without a permit, and—theoretically—if you need a larger deck, you could . If the grade slopes under the footprint of the deck, however, resulting in one edge that is greater than 30 inches above grade, then that edge of the

Mar 1, 1999 Whenever I build decks, I place the piers and then cut posts to carry the girders that will support the deck framing. The bottoms of the girders are in the same plane, but all the piers are at slightly different elevations. The problem becomes how to calculate the length of each post efficiently. As shown in the

I want to build a deck for my aboveground swimming pool that can be dismantled for winter. My yard is very uneven. The pool is 16'x 4'. I was thinking cement deck blocks with 4 x 4 post to level it & build the deck with 2 x 4's. Is there a way to do this in sections in order to dismantle in the fall? 2 Answers. William Burbank, IL.

Building a deck on a sloped site isn't much more difficult than on a level surface—so long as you plan for the difference. We'll show you how to plan for, lay out, and build your deck on uneven ground.

Lay Concrete Deck Blocks to Support the Small Deck. Picture of cement deck blocks. Easy to situate as needed on your site, cement deck blocks provide the foundation for floating decks, as shown in this picture. David Beaulieu. The floating deck in this project will stand just 9 inches off the ground. Concrete